Trenching and Digging

Trenching

SAFETY TIP: Start your trenching project the right way.  Call 811 at least 3 working days before digging to have your local utilities mark buried lines.

06-001(1)
06-001(1)
  • 4" x 24" Trench
  • Walk-behind
  • 11 hp Honda Engine
  • Straight line trench only
  • 780 lb
  • 6" x 30" Trench
  • Walk-behind
  • 11 hp Honda Engine
  • Straight line trench only
  • 780 lb



06-02_Track06-05-2
  • 6" x 36" Trench
  • Walk-behind
  • 20 hp Kawasaki gas engine
  • 1200 lb
  • 6" x 48" Trench
  • Walk-behind
  • 26hp Kawasaki gas engine
  • 1250 lb



06-0806-15
  • 8" x 48" Trench
  • Ride-on
  • 35 hp Diesel Engine
  • 4200 lb
  • Frost chain available
  • 1/2" x 4" Cable layer
  • Honda engine
  • Must be pulled backward
  • Ideal for laying dog fencing, low voltage cable, or SDI
  • 135-150 lb depending on model



06-20
  • 2" x 8" Trench
  • 3.5 hp Honda engine
  • Ideal for laying underground cables or sprinkler systems
  • 140 lb
  • Unit must be pushed - not self propelled